1 |
An association class must be created to store the attributes of a ____ relationship among two other classes. |
One to one
One to many
Many to one
Many to many
|
2 |
The designing phase includes the following activates EXCEPT. |
Designing and integrating the network.
Designing the application architecture
Designing the user interface
Designing the project team
|
3 |
A diagram that shows the major subsystems in an object oriented system is called a |
System flowchart
Design class diagram
package diagram
Component diagrams
|
4 |
A measure of the internal strength of a module in a structure chart is called. |
Module integrity
Module coupling
Module functionality
Module cohesion
|
5 |
Which of the following is not a traditional method of collecting system requirements. |
Interviewing
Red
Observations
Document analysis
|
6 |
Which approach to development is the most interactive and focuses more on the user and their work. |
Modern structured analysis
Information engineering
Structured design
Object oriented analysis
|
7 |
Which of the following replicates the decision making process rather than manipulates information. |
Management replication system
Management information system
Expert system
Decision support system
|
8 |
Which of the following is not one of te four major classes of information system. |
Decision support system
Collaboration system
Management information system
Expert system
|
9 |
Which would be the best representation for "A customer sending in a a payment. |
Data
Data flow
Information
Data store
|
10 |
Which of the following focus on output and processing logic. |
Data models
Data oriented approach
system development approach
Information models
|
11 |
Which of the following fact finding technique is most useful in collecting quantitative data |
Interviews
Record reviews
Observation
Works shops
|
12 |
The rules and semantics of the UML can be expressed in a form known as |
Object modeling language
Object constraint language
Object specification language
Object control language
|
13 |
Which diagram depicts a pattern of messages coming into and going from an object. |
Collaboration diagram
Sequence diagram
Class diagram
Object diagram
|
14 |
Which of the following highlights the feasibility report of an existing system. |
Data flow and processing
Information needs
Problem areas
Data storage
|
15 |
_____ refers to the number of connections between a calling and called module and the complexity of these connections. |
Module coupling
Transaction
evaluation
Cohesion
|
16 |
Which of the following UML diagram provides static structure of a system. |
Class diagram
Sequence diagram
State diagram
Activity diagram
|
17 |
_______ design is a data flow based methodology |
Physical
Logical
Structure
Object oriented
|
18 |
The symbol represents |
Aggregation
Generalization
Dependency
Association
|
19 |
The main issue in documentation during the___ phase is to determine what the system must do. |
Analysis
Design
Implementation
Coding
|
20 |
Which of the following is not a form of decision table. |
Limited entry
Double entry
Mixed entry
Extended entry
|
21 |
Which of the following activities are included in the OO system development. |
use case driven analysis
Design
Prototyping
All of the above
|
22 |
________ refers to the number of subordinate modules controlled by a calling module. |
span of control
Coupling
Cohesion
Integration
|
23 |
______________is a variation of simple aggregation it is a strong type of aggregation. |
Component aggregation
Intendance
Composition
Association
|
24 |
A post implementation review looks into. |
Goals achieved vis a vis targets
User friendliness of the system
Realization of cos benefits
Both a ,b and c
|
25 |
__________ refers to the process of using software in a life environment in order to find errors. |
Verification
Clarification
Determination
Validation
|
26 |
Which of the following system test determine the length of time the system uses to process transaction data. |
Recovery testing
Performance time testing
Peak load test
Silk testing
|
27 |
___________ are not parts of the system the represent anyone or anything that must interact with the system. |
Use cases
Actors
Components
None of the above
|
28 |
During project inception the intent of he task is |
Implementing the project
Designing a solution
Analysis of the problem
Programming
|
29 |
Which of the following is a combination of data and logic that represents some real world entity. |
Relationship
Object
Attributes
Method
|
30 |
Application prototyping follows an organized process or steps that begins with. |
Use protype
Review prototype
Develop working model
Identify known requirements
|