1 |
Who is not involved in joint application development who uses workshop with the following personnel. |
System owners
System designers
System operators
System users
|
2 |
Facts gathering technique play a crucial role of systems development projects Which technique would you highly recommend for a situation where very accurate answers and clarification ware needed. |
Questionnaire
Record inspection
Interview
Observation
|
3 |
Which shows a the top level function defined to over the scope of the application |
Data flow diagram
Decision table
Context diagram
Flow charting
|
4 |
The willingness and ability of management employees customers suppliers and so forth of an organization to operate use and support a proposed system what do you mean by the above. |
Economic feasibility
Cost analysis
Operational feasibility
Technological feasibility
|
5 |
In which of the following phases of the system development life cycle elimination of errors in the system and tuning the system for any variations in a its working environment will be done. |
system maintences
System specification
System design
System testing
|
6 |
Which of the following are not parts of the system they represent anyone or anything that must interact with the system. |
Use cases
Actors
Components
Classess
|
7 |
Creating an object model from a existing relational database layout is referred to as. |
Forward engineering
Backward engineering
reverse engineering
Bottom up engineering
|
8 |
The rules and semantics of the UML can be expressed in a form known as. |
Object modeling language
Object constraint language
Object control language
Object driven langage
|
9 |
Which of the following diagram vacuolizes the distribution of components across the enterprise. |
Component diagram
Use case diagram
Deployment diagram
Class diagram
|
10 |
Which of the following activities are included in the 00 system develoment. |
Use case driven analysis
Design
Prototyping
all of the above
|
11 |
When of the following is a main component of a decision trees. |
Entity
Process
Action
Condition
|
12 |
The lowest level of decompositiion for a data flow diagram is. |
Primitive DFD
Unit DFD
Context DFD
Level -0 DFD
|
13 |
Which of the following describes the changes made to system to add new features or to improve performances. |
Corrective maintenance
Adaptive maintenance
Perfective maintenance
productive maintenance
|
14 |
The willingness an ability of management employees customers suppliers and so forth of an organization to operate use and support a proposed system is known as |
Economic feasibility
Cost analysis
Technological feasibility
Operational feasibility
|
15 |
Cost reduction and avoidance eror reduction and increased speed of activity are example's of |
Intangible costs
Tangible benefits
Intangible benefits
None of the above
|
16 |
Which of the following reflects the project managers best guess of the amount of time an activity actuality requires for completion. |
Optimistic time
Passimistic time
realistic time
Physical time
|
17 |
Technical detailed specification of all system elements are the product of |
Logical design
Physical design
Analysis
Implementation
|
18 |
A data dictionary is a part of a larger collection of project information called a |
Repository
Data flow diagram
Meta data file
Data structure
|
19 |
Which among the following is not an activity of requirement determination |
Requirement anticipation
Requirement investigation
Requirement Specification
Requirement Gathering
|
20 |
When the question measures what the analyst intended to measure the question is called. |
Closed
Open ended
Inconsistent
Valid
|
21 |
The charts which mark significant points in the development of a project are. |
PERT
Milestone charges
CPM
Structured charts
|
22 |
Which among the following is not a level of quality assurance. |
Testing
Verification
Validation
Observation
|
23 |
Which of the following is not a system conversion strategy. |
Direct changeover
Parallel conversion
Deferred conversion
Phase in conversion
|
24 |
Th strongest quality management action that a systems analysis team can perform is. |
Structured programming
Structured walkthrough
Modular programming.
Object oriented programming
|
25 |
How is composition represented in a class diagram |
A circle
A rounded rectangle
An ellipse
A solid diamond
|
26 |
Which of the following represent a built in extensibility mechanism of the UML. |
Note
meta model
Stereotype
Class
|
27 |
Which of the following is a measure of the strength of association among object. |
cohesion
Coupling
Corollary
Collaboration
|
28 |
_________ test the interaction among components as specified during the high level design phase of the system development life cycle. |
Driver testing
Integration testing
Unit testing
Module testing
|
29 |
A set of classes that are specifically designed to be request in a wide variety of programs is referred to variety of programs is referred to as. |
Object frame work
Foundation classes
Interface classes
Methodology
|
30 |
Designing the inputs and outputs involved when the user interacts with the computer to carry out a task helps to create the. |
User requirements
System Interface
User interface
Task boundary
|