1 |
An important benefit of ________ is that they enable the code to be tested before the execution environment is ready |
code inspections
Authors
Inexperienced staff
Moderators
|
2 |
An important benefit of ___ is that they enable the code to be tested before the execution environment is ready. |
Code inspections
Authors
Inexperienced staff
Moderators
|
3 |
User requirement are the best source of expected outcomes for user _____ scripts. |
Actual results
Program specification
Acceptance test
System specification
|
4 |
A________ is lead by the author where an inspection is lead by a |
Inspector
Reader
Inspector reader
Author, trained moderator
|
5 |
Quality audits define the process of project compliance with. |
Quality control
Quality assurances
Polices and procedures
Quality control management
|
6 |
Project quality management includes all activities of the performing organization that determines. |
Performance quilt control
Policies and responsibilities of a project
Performance plan management
Quality control management
|
7 |
Which of the following are negative possibilities it quality requirement are not met. |
Overworking team members and poor product quality
Customer complains and late product
Poor quality
Termination
|
8 |
Quality planning is used for __________ |
Quality projections
Quality management
Identifying quality standards and how to satisfy them
Quality over view
|
9 |
Which of the following definitions apply to the cost of quality. |
Left over product
Total cost of all project affords
Customer satisfaction
Redoing entire project
|
10 |
The structure testing is sometimes called. |
Glass box testing
Black box testing
Unit testing
While box testing
|
11 |
The functional testing is sometimes called. |
White box testing
Unit testing
Glass box testing
Black box testing
|
12 |
The goal of regression testing is to minimize the cost of system. |
Development
Process
Revalidation
Factors
|
13 |
The third dimension of the cube is the tet. |
Tactics
Process
data
Program
|
14 |
In testing how many testing factors are there. |
15
20
45
8
|
15 |
The risks associates with testing will be called. |
test result
Test process
Test factors
Test data
|
16 |
The requirement phase is undertaken to solve a. |
Business problem
System problem
Program problem
Design problem
|
17 |
The requirement phase is the most cost effective phase in which to detect a. |
Program flow
Design flow
Data flow
System flow
|
18 |
The requirement phase should be a _______ phase. |
User requirement
User dominated
User participants
User information
|
19 |
A potential problem with the point system described thus far has to do with and effort known as a. |
Rolling baseline
Package
Technique
Computing
|
20 |
The scheme is flexible and can be modified to meet the needs of projects both. |
Coding and design
Testing and implementing
Large and small
Types and scheme
|
21 |
The software testing process follows the aforementioned ________ concept of testing. |
S
Y
N
V
|
22 |
Life cycle testing involves ______ testing of the system during the developmental process. |
Begin
Continuous
system
Process
|
23 |
Parametric models sometimes called. |
WAG
MODELS
SWAG
HEURISTIC
|
24 |
SWAG is the method used by most software estimating packages such as. |
PATTERN
ESTIMACS
CHANGE
WAG
|
25 |
An inaccurate estimate particularity in estimating effort can force developers to compromises |
Softwear level
Software status
Software report
software quality
|
26 |
The documents information and skills needed to complete in which step. |
Concerns
Output
Objective
Input
|
27 |
Validation is used to test the software in which mode. |
Process mode
Executable mode
Test mode
Primary mode
|
28 |
Testing should indicate the cost to test _____ the cost of undetected defects. |
Plus
Negative
Positive
Minus
|
29 |
There are______ general categories of testing. |
One
Two
Three
Four
|
30 |
Static tests are used in the requirement and |
Design phase
Testing phase
Program test phase
Manual test phase
|