1 |
Error Questing is not a ________ testing technique. |
Static
Walkthrough
Data flow analysis
Inspections
|
2 |
Tests are prioritized so that it is possible to. |
Shorten the time required for testing
Do the best testing in the time available
Do more effective testing
Find more faults
|
3 |
Design fault is a reason for |
Testing fault
Software fault
Failure
Documentation fault
|
4 |
If an expected result is specified than |
We cannot run that test
It may be difficult to repeat the test
It may be difficult to determine if the test has passed or failed
We cannot automate the user inputs
|
5 |
A ___________ will help ensure unchanged areas of the software have ot been affected. |
Documentation
Regression test
Software fault
Acceptance testing
|
6 |
_________ testing is done by user |
System testing
Acceptance testing
Black box testing
White box testing
|
7 |
The basis upon which adherence to policies is measured as |
Standard
Requirement
Expected result
Value
|
8 |
The statement of an organization's policy. |
Vision
Mission
principle
Goal
|
9 |
Acceptance testing will be done by |
User
Quality control
Quality assurance
Senior management
|
10 |
Total cost of all project efforts definition applies to the |
Left over product
Cost of quality
Customer satisfaction
Redoing entire project
|
11 |
Which of these terms apply to identifying quality standards and how to satisfy them. |
Quality projections
Quality management
Quality planning
Quality overview
|
12 |
Over working team members and poor product quality are negative possibilities if |
Quality requirements are not met
Due to customer complaints and late product.
Poor quality
Termination
|
13 |
Which of the processes includes all activates of the performing organization that determines policies and responsibilities of a project. |
Performance quality control
Project quality management
Performance plan management
Quality control management.
|
14 |
Which team defines the process of project compliance with policies and procedures. |
Quality control
Quality assurances
Quality audits
Quality control management
|
15 |
Small team established to use the tool when a new _____ tool is purchased |
Testing
Design
Coding
Actual testing
|
16 |
___________ occurs during the construction stage of development. |
Plan
Design
Coding
Actual testing
|
17 |
Equivalence partitioning is. |
A black box testing technique used only by developers
A black box testing technique than can only be used during system testing.
A black box testing technique appropriate to all levels of testing
A white box testing technique appropriate for component testing.
|
18 |
Cycloramic complexity method comes under which testing method. |
white box
Black box
Green box
Black/white box
|
19 |
The concept of fit is importantin___ |
Design only
Both design and testing
Testing only
Requirement analysis only
|
20 |
___ is the technique used to determine that the solution solves the problem. |
Data
Validity
Testing
Problem
|
21 |
successful _________ necessitates a portfolio of web based testing tools. |
Web based testing
Integrate
Factor
Unit testing
|
22 |
The process starting with the________ modules is called bottom up integration. |
Starting
Terminal
Integrated
None of the above
|
23 |
__ process does not include deliverable base lining. |
Defect prevention
defect management
Management reporting
Prevention reporting
|
24 |
_________ system will unlikely to cause a failure. |
Liked by user
Fault free
Reliable
Management satisfaction
|
25 |
The inputs for developing a ________ are taken from project plan. |
Test plan
Business plan
Support plan
Final test report
|
26 |
The process starting with the terminal modules is called. |
Top down integration
Bottom up integration
Module integration
None of the abvoe
|
27 |
The purpose of requirement phase is. |
To freeze requirements
Environment fault
Check exit criteria completion
Able to write shftware
|
28 |
Which in general is the least required skill of a good tester. |
Being diplomatic
Able to write software
Having good attention to detail
Able to be relied on
|
29 |
During which test activity could faults be found most cost effectively. |
Execution
Design
Planning
Check exit criteria completion
|
30 |
A______ is a condition that can result in a loss. |
Test
Risk
Method
Gain
|