PPSC Computer Science Chapter 23 Software Testing Online Test With Answers

PPSC Computer Science Chapter 23 Software Testing Online Test

Sr. # Questions Answers Choice
1 In a review meeting a moderator is a person who. Takes minutes of the meeting Mediates between people Takes telephone calls Writes the documents to be reviewed
2 During the software development process at what point can the test process start. When the code is complete When the design is complete When the software requirements have been approved When the fist code module is ready for unit testing.
3 Pick the best definitions of quality. Quality is job one Zero defects Conformance to requirements Work as designed
4 To test a function, the programmer has to write a ______ which calls the function to be tested and passes it test data. Stub Driver Proxy Quality is job one
5 Which of the following is not a quality characteristic listed in ISO 9126 standard. Functionality Usability Supportability Maintainability
6 Incorrect form of logic coverage is. Statement coverage Pole coverage Condition coverage Path coverage
7 Which of the following tools would be involved in the automation of regression test. Data tester Boundary tester capture of playback Output comparator
8 Which one of the following are non functional testing methods. System testing Usability testing Performance testing Both 2 and 3
9 Code coverage is used as a 208 measure of what. Defects Trends analysis Test effectiveness Time spent testing
10 Acceptance test cases are based on what. Requirements Design Code Decision table
11 Which of the following is the standard for the software product quality. ISO 1926 ISO 829 ISO 1012 ISO 1028
12 The________ testing will be performed by the people at client own locations. Alpha testing Field testing Performance testing system testing
13 Which is not a testing principle. Early testing Defect clustering Pesticide paradox Exhaustive testing
14 Who is responsible for document all the issues, problems and open points that were identified during the review meeting. Moderator scribe Reviewers Author
15 Bug life cycle is. Open assigned fixed closed Open fixed, assigned, closed Assigned, open closed, fixed Assigned, Open, fixed, closed
16 Which is not the project risk. Supplier issues Organization factors Technical issues error prone software delivered
17 Maintenance releases and technical assistance centers are examples of which of the following costs of quality. External failure Internal failure Appraisal Prevention
18 Contract and regulation testing is a part of. system testing Acceptance testing Integration testing Smoke testing
19 Poor software characteristics are. Only project risks Only product risks Project risks and product risks Project risks or product risk
20 Review static analysis and dynamic testing have the same ____ as objective. Identifying defects Fixing defects 1 and 2 None of the above
Download This Set

Is this page helpful?