PPSC Computer Science Chapter 23 Software Testing Online Test With Answers

PPSC Computer Science Chapter 23 Software Testing Online Test

Sr. # Questions Answers Choice
1 Based on the risks for the system being tested ______ be stopped. Planning when time has run out when all faults have been fixed correctly Testing
2 Based on the risk for your industry contract and special requirements ____ is done. Planning when time has run out Testing When all faults have been fixed correctly
3 At all test levels ______ testing is performed. Acceptance testing Functional Integrating testing Regression
4 Which of the following is the best source of Expected Outcomes for User Acceptance Test scripts. Actual results Program specification User requirements system specification
5 Which of these activates provides the biggest potential cost saving from the use of CAST. Test management Test design Test execution Test planning
6 Which of the following is true of the v-model. It states that modules are tested against user requirements It only models the testing phase It specifies the test techniques to be sued It includes the verification of designs
7 In prioritizing what to test the most important objective is to. Find as many faults as possible Test high risk areas Obtain good test coverage Test what ever is easiest to test
8 Which of the following a described in a unit test standard. Syntax testing Fulvalene partitioning Stress testing Modified condition or decisioncoverage
9 Which of the following is a form of functional testing. Boundary value analysis Usability testing Performance testing Security testing
10 Error guessing is best used. After more formal techniques have been applied As the first approach to deriving test cases By inexperienced testers After the system has gone live
11 Which of the following is included in the test plan document of the test documentation standard. What is not to be tested Test environment properties Quality plans Schedules and deadlines
12 Which of the following is part of system testing. Business process based testing Performance load and stress testing Usability testing Top down integration testing
13 Expected result are Only important in system testing Only used in component testing Most useful when specified in advance Derived from the code
14 The main focus of acceptance testing is. Finding faults in the system Ensuring that the system is acceptable to all users Testing the system with other systems. Testing from a business perspective
15 Which of the following techniques is NOT a black box technique. State transition testing. LCSAJ Syntax testing Boundary value analysis
16 Maintenance testing is. Updating tests when the soft ware has changed. Testing a released system the has been changed Testing by users to ensure that the system meets a business need. Testing to maintain business advantage
17 Which of the following is NOT part of configuration management. Auditing conformance to ISO 9000 Status accounting of configuration items Identification of test versions Controlled library access
18 Regression testing should be performed. Every week After the software has changed As often as possible When the environment has changed
19 Statement coverage will to check for the following. Missing statements Unused branches Dead code Unused statement
20 A common test techniques during component test is. Statement and branch testing Usability testing. Security testing Performance testing
Download This Set

Is this page helpful?