PPSC Computer Science Chapter 23 Software Testing Online Test With Answers

PPSC Computer Science Chapter 23 Software Testing Online Test

Sr. # Questions Answers Choice
1 A_ is a central repository of data made available to users Data base Data warehouse Data mine Data process
2 Test documentation is important for conducting the test and for the reuse of the test program during. Maintences Plan Code Design
3 The best documentation is a part of the systems. computer Analysis Retest documentation
4 It is helpful in preparing for the test of conducting the test. Summary Milestones Testing References
5 _______ identifies the participating organizations in thetas process and the locations where the software will be tested. Life cycle software Process Testing.
6 The phase of the system development life cycle in which testing will occurs is. Test factor Authorization Test phase Audit trail
7 _______ includes the verification of designs. Off the shelf sotware Validation Verification V-model
8 Which of the following would normally form part of a test plan frailer process Incident reports Risks Data process
9 Which of the following is a white box technique. Statement testing Process testing System flow testing State transition testing
10 The user of data on paths through the code is. Possible communications bottleneck's in a program The rate of change of data values as a program executes Data flow analysis The intrinsic complexity of the code
11 An important benefit of ________ is that they enable the code to be tested before the execution environment is ready code inspections Authors Inexperienced staff Moderators
12 An important benefit of ___ is that they enable the code to be tested before the execution environment is ready. Code inspections Authors Inexperienced staff Moderators
13 User requirement are the best source of expected outcomes for user _____ scripts. Actual results Program specification Acceptance test System specification
14 A________ is lead by the author where an inspection is lead by a Inspector Reader Inspector reader Author, trained moderator
15 Quality audits define the process of project compliance with. Quality control Quality assurances Polices and procedures Quality control management
16 Project quality management includes all activities of the performing organization that determines. Performance quilt control Policies and responsibilities of a project Performance plan management Quality control management
17 Which of the following are negative possibilities it quality requirement are not met. Overworking team members and poor product quality Customer complains and late product Poor quality Termination
18 Quality planning is used for __________ Quality projections Quality management Identifying quality standards and how to satisfy them Quality over view
19 Which of the following definitions apply to the cost of quality. Left over product Total cost of all project affords Customer satisfaction Redoing entire project
20 The structure testing is sometimes called. Glass box testing Black box testing Unit testing While box testing
Download This Set

Is this page helpful?