PPSC Computer Science Topic 23 MCQ's Test Preparation

Students who have done their computer science studies and are waiting for the Punjab Public Service Commission, PPSC to announce the latest test schedule for PPSC Computer Science Test, they are informed that the Commission announces the schedule of every particular test annually. Students who are willing to appear for the PPSC test this year, they are advised to prepare well before going to appear exams. The reason behind it is that the test is highly competitive and you have to compete with a large number of candidates to secure your desired positions. However, in order to assist the students, Ilmkidunay comes with the PPSC online MCQs tests to get a maximum of practice.

MCQ's Test For PPSC Computer Science Topic 23 Software Testing

Try The MCQ's Test For PPSC Computer Science Topic 23 Software Testing

  • Total Questions20

  • Time Allowed20

PPSC Computer Science Topic 23 Software Testing

00:00
Question # 1

The statement of an organization's policy.

Question # 2

The requirement phase is the most cost effective phase in which to detect a.

Question # 3

Which of the following is NOT part of configuration management.

Question # 4

Which of the following could be ta reason for a failure.

Question # 5

Which in general is the least required skill of a good tester.

Question # 6

Over working team members and poor product quality are negative possibilities if

Question # 7

Based on the risks for the system being tested ______ be stopped.

Question # 8

The identified software problems that most commonly cause._______ by automated decision making applications.

Question # 9

Which of these is a debugging tool.

Question # 10

Regression testing should be performed.

Question # 11

The requirement phase should be a _______ phase.

Question # 12

Acceptance testing will be done by

Question # 13

Which one of the following are non functional testing methods.

Question # 14

Which of the following is not a characteristic for testability.

Question # 15

A potential problem with the point system described thus far has to do with and effort known as a.

Question # 16

For which of the following would a static analysis tool be MOST useful.

Question # 17

Parametric models sometimes called.

Question # 18

Effective testing will reduce ________ cost.

Question # 19

__ process does not include deliverable base lining.

Question # 20

Hybrid testing is

Prepare Complete Set Wise PPSC Computer Science Topic 23 Software Testing MCQs Online With Answers


Topic Test

00:00

Top Scorers Of PPSC Computer Science Topic 23 Software Testing MCQ`s Test

  • A
    ashi khan 18 - Jun - 2022 00 Min 05 Sec 20/20
  • S
    samreen Riaz 22 - Jun - 2024 07 Min 37 Sec 20/20
  • T
    Taqdees Ashraf 13 - Jun - 2022 05 Min 36 Sec 18/20
  • Z
    zoraiz 07 - Jan - 2022 06 Min 42 Sec 17/20
  • T
    Teeba Khan 16 - Jun - 2022 02 Min 48 Sec 15/20
  • F
    Fawad Hassan 27 - Jun - 2024 05 Min 04 Sec 14/20
  • E
    Esha fatima 13 - Jul - 2024 07 Min 22 Sec 14/20
  • H
    Hiba Arshad 13 - Jun - 2023 08 Min 38 Sec 14/20
  • M
    Musarat Iqbal 13 - Jul - 2024 19 Min 38 Sec 14/20
  • I
    Irum Manzoor 13 - Jun - 2023 05 Min 03 Sec 11/20
  • N
    nasreen ashraf 25 - Dec - 2021 06 Min 57 Sec 11/20
  • M
    Mnal Khan 10 - Jun - 2022 04 Min 01 Sec 10/20
  • L
    laiba 13 - Jun - 2022 08 Min 10 Sec 10/20
  • S
    sumaira hayat 27 - Jul - 2024 05 Min 26 Sec 9/20
  • ?
    ???? ???? 14 - Jul - 2024 08 Min 34 Sec 9/20

PPSC ComputerScience Chapter 23 Important MCQ's

Sr.# Question Answer
1 The testing methodology ________ represents.
A. Cube
B. Triangle
C. Circle
D. Rectangle
2 Which of the following is not a quality characteristic listed in ISO 9126 standard.
A. Functionality
B. Usability
C. Supportability
D. Maintainability
3 Life cycle testing involves ______ testing of the system during the developmental process.
A. Begin
B. Continuous
C. system
D. Process
4 A ___________ will help ensure unchanged areas of the software have ot been affected.
A. Documentation
B. Regression test
C. Software fault
D. Acceptance testing
5 The requirement phase is the most cost effective phase in which to detect a.
A. Program flow
B. Design flow
C. Data flow
D. System flow
6 Maintenance testing is.
A. Updating tests when the soft ware has changed.
B. Testing a released system the has been changed
C. Testing by users to ensure that the system meets a business need.
D. Testing to maintain business advantage
7 To test a function, the programmer has to write a driver which calls the function and passes it.
A. stub
B. Test data
C. Proxy
D. Package
8 A sub path is a ____ from one plce in the program to another.
A. Route
B. Sequence of lines
C. Sequence of statements
D. Gateway
9 Bug life cycle is.
A. Open assigned fixed closed
B. Open fixed, assigned, closed
C. Assigned, open closed, fixed
D. Assigned, Open, fixed, closed
10 The scheme is flexible and can be modified to meet the needs of projects both.
A. Coding and design
B. Testing and implementing
C. Large and small
D. Types and scheme

Test Questions