Students who have done their computer science studies and are waiting for the Punjab Public Service Commission, PPSC to announce the latest test schedule for PPSC Computer Science Test, they are informed that the Commission announces the schedule of every particular test annually. Students who are willing to appear for the PPSC test this year, they are advised to prepare well before going to appear exams. The reason behind it is that the test is highly competitive and you have to compete with a large number of candidates to secure your desired positions. However, in order to assist the students, Ilmkidunay comes with the PPSC online MCQs tests to get a maximum of practice.

MCQ's Test For PPSC Computer Science Topic 23 Software Testing

Try The MCQ's Test For PPSC Computer Science Topic 23 Software Testing

  • Total Questions20

  • Time Allowed20

PPSC Computer Science Topic 23 Software Testing

00:00
Question # 1

Quality audits define the process of project compliance with.

Question # 2

The requirement phase is the most cost effective phase in which to detect a.

Question # 3

Computer system are interconnected into__________ such taht problems in one can cascade into and affect others.

Question # 4

SWAG is the method used by most software estimating packages such as.

Question # 5

SDLC stand for.

Question # 6

Which of the following is not a quality characteristic listed in ISO 9126 standard.

Question # 7

Error guessing is best used.

Question # 8

_______ includes the verification of designs.

Question # 9

What is the difference between testing software developed by contractor outside your country versus testing software developed by a contractor within your country.

Question # 10

Small team established to use the tool when a new _____ tool is purchased

Question # 11

A sub path is a ____ from one plce in the program to another.

Question # 12

It is helpful in preparing for the test of conducting the test.

Question # 13

The process starting with the terminal modules is called.

Question # 14

The_____ is undertaken to solve a business problem.

Question # 15

______ is a black box testing technique appropriate to all levels of testing.

Question # 16

Which of these is a debugging tool.

Question # 17

Code coverage is used as a 208 measure of what.

Question # 18

__________ method comes under white box testing method.

Question # 19

Which of the following is not a characteristic for testability.

Question # 20

Error Questing is not a ________ testing technique.

Prepare Complete Set Wise PPSC Computer Science Topic 23 Software Testing MCQs Online With Answers


Topic Test

00:00

Top Scorers Of PPSC Computer Science Topic 23 Software Testing MCQ`s Test

  • A
    ashi khan 18 - Jun - 2022 00 Min 05 Sec 20/20
  • S
    samreen Riaz 22 - Jun - 2024 07 Min 37 Sec 20/20
  • T
    Taqdees Ashraf 13 - Jun - 2022 05 Min 36 Sec 18/20
  • Z
    zoraiz 07 - Jan - 2022 06 Min 42 Sec 17/20
  • T
    Teeba Khan 16 - Jun - 2022 02 Min 48 Sec 15/20
  • F
    Fawad Hassan 27 - Jun - 2024 05 Min 04 Sec 14/20
  • E
    Esha fatima 13 - Jul - 2024 07 Min 22 Sec 14/20
  • H
    Hiba Arshad 13 - Jun - 2023 08 Min 38 Sec 14/20
  • M
    Musarat Iqbal 13 - Jul - 2024 19 Min 38 Sec 14/20
  • I
    Irum Manzoor 13 - Jun - 2023 05 Min 03 Sec 11/20
  • N
    nasreen ashraf 25 - Dec - 2021 06 Min 57 Sec 11/20
  • M
    Mnal Khan 10 - Jun - 2022 04 Min 01 Sec 10/20
  • L
    laiba 13 - Jun - 2022 08 Min 10 Sec 10/20
  • S
    sumaira hayat 27 - Jul - 2024 05 Min 26 Sec 9/20
  • ?
    ???? ???? 14 - Jul - 2024 08 Min 34 Sec 9/20

PPSC ComputerScience Chapter 23 Important MCQ's

Sr.# Question Answer
1 Which of the following is a debugging approach.
A. Brute force method
B. Inheritance
C. Data flow diagrams
D. ER Diagrams
2 Which of the following is a purpose of the review planning phase.
A. Log defects
B. Explain he documents to the participants
C. Gather metrics
D. Allocate the individual roles
3 Tests are prioritized so that it is possible to.
A. Shorten the time required for testing
B. Do the best testing in the time available
C. Do more effective testing
D. Find more faults
4 A sub path is a ____ from one plce in the program to another.
A. Route
B. Sequence of lines
C. Sequence of statements
D. Gateway
5 Which in general is the least required skill of a good tester.
A. Being diplomatic
B. Able to write software
C. Having good attention to detail
D. Able to be relied on
6 What is critical in Web testing.
A. Performances and functionality
B. Functionality and usability
C. Usability and performance
D. Debugging
7 A reliable system will be one that.
A. Is unlikely to be completed on schedule
B. Is unlikely to cause a failure
C. Is likely to be fault free
D. Is likely to be liked by the users
8 Which of the following is part of system testing.
A. Business process based testing
B. Performance load and stress testing
C. Usability testing
D. Top down integration testing
9 Which of the following is the best source of Expected Outcomes for User Acceptance Test scripts.
A. Actual results
B. Program specification
C. User requirements
D. system specification
10 The requirement phase is the most cost effective phase in which to detect a.
A. Program flow
B. Design flow
C. Data flow
D. System flow