ECAT Pre Computer Science MCQ Test For Computer Chapter 7 With Answer

MCQ's Test For ECAT Computer Science Chapter 7 Fortran 77

Try The MCQ's Test For ECAT Computer Science Chapter 7 Fortran 77

  • Total Questions15

  • Time Allowed15

ECAT Computer Science Chapter 7 Fortran 77

00:00
Question # 1

Program maintenance means

Question # 2

To activate an object, send

Question # 3

After starting the solution to a problem is pesudocode, the next step would be

Question # 4

What is telecommuting?

Question # 5

An A/D converter does the conversion from

Question # 6

The language named for a French mathematician is

Question # 7

By word processing we mean

Question # 8

Conferencing in relation to computer systems means

Question # 9

The presence of both data and its related instructions in an object is

Question # 10

Which of the following is the example of sequential circuit

Question # 11

Positioning of headings and columns for the report format, considered during system design, might use.

Question # 12

The data obtained by counting are called

Question # 13

During the development of a program, drawing a flowchart is a means to

Question # 14

Super computers are usually designed to process complex scientific applications and the computational speed of the system is most important. Each address in the CRAY-1 holds

Question # 15

A group of characters that are treated as a single entity.

Prepare Complete Set Wise ECAT Computer Science Chapter 7 Fortran 77 MCQs Online With Answers


Topic Test

00:00

Top Scorers Of ECAT Computer Science Chapter 7 Fortran 77 MCQ`s Test

  • A
    Amna Naz 16 - Nov - 2024 01 Min 16 Sec 60/60
  • H
    Husain Abbas 20 - Dec - 2024 01 Min 26 Sec 60/60
  • A
    Abdullah Baloch 26 - Jul - 2024 02 Min 23 Sec 60/60
  • M
    Muhammad Saeed anwar 03 - Jun - 2024 05 Min 20 Sec 60/60
  • T
    Tasser Haider 28 - May - 2024 01 Min 23 Sec 55/60
  • A
    Alinza Waseem 04 - Jun - 2024 02 Min 31 Sec 55/60
  • F
    fatema naveed 17 - Jun - 2026 03 Min 55 Sec 52/60
  • R
    RONIN 06 - Jul - 2024 01 Min 28 Sec 50/60
  • L
    Lubna Nadeem 17 - Jun - 2026 02 Min 12 Sec 48/60
  • U
    Unknown 31 - May - 2024 00 Min 53 Sec 45/60
  • M
    Manoush Fatima 02 - Jun - 2024 02 Min 16 Sec 40/60
  • T
    Taha X27 05 - Dec - 2025 03 Min 24 Sec 36/60
  • A
    ali moid 19 - Jul - 2024 01 Min 01 Sec 35/60
  • M
    Maneeha Yousuf 26 - May - 2024 03 Min 30 Sec 35/60
  • H
    Hassan Sajid 02 - Jun - 2024 06 Min 16 Sec 35/60

ECAT Computer Sciences Chapter 7 Important MCQ's

Sr.# Question Answer
1 A bootstrap is.
A. the flat cable that connects the CPU to the printer
B. the flat cable from the disk controller card to the disk drive
C. additional memory device
D. a small initialization program to start up the computer
2 The five basic parts of a computer system are
A. hardware, software, memory,VDU, and magnetic tape
B. store,arithmatic and logic unit, control unit, input device, and output device
C. CPU, ALU,software,firmware, and operating system
D. data bus,control lines,address bus,memory, and printer
3 Real time computing is possible because of the following number of storage locations
A. storage capability
B. high speed
C. accuracy
D. versatility
4 A systems analyst would observe the flow of data and interrelations of people within an organization during.
A. detail design
B. preliminary design
C. systems analysis
D. a system survey
5 What is telecommuting?
A. a special form of electronic mail
B. a new trend in roboties that may take the place of cars
C. a trend towards working at home using personal computers and modems
D. none of these
6 Pictures on a monitor are composed of tiny dots called.
A. a pixels
B. CRTs
C. VDTs
D. elements
7 An error in a computer hardware and software is called a bug. Another name for its is
A. glitch
B. hacker
C. virus
D. pixel
8 Data gathering and data analysis take place.
A. after the system survey
B. after system analysis
C. during system design
D. during evaluation
9 Specifying the kind of input, processing, and output required for a program occurs when
A. planning the solution
B. flowcharting the problem
C. coding the problem
D. defining the problem
10 In developing a program, documentation should be done
A. as the last step
B. throughout the process
C. only to explain errors
D. only during the design phase

Test Questions

Share your comments & questions here

Guest
  • hghgh

    hghgh

    31 Aug 2018

    ;lkjjk;ljlml;

    Like
    Reply