CSS General Knowledge Chapter 3 Online Entry Test With Answers

CSS General Knowledge Chapter 3 Online Entry Test

Sr. # Questions Answers Choice
1 The second highest peak of Hindukush is: Sikeram Sakesar Noshaq K-2
2 The total height of the Tirich Mir is: 7000 metres 7300 metres 7600 metres 7699 metres
3 Tirich Mir is the highest peak of: Salt Range Hindukush Koh-i-Sulaiman K-2
4 Marala Barrage was constructed on the river: Indus Ravi Chenab Jehlum
5 Rasul Barrage was built on the river: Jehlum Ravi Chenab Indus
6 Rasul Barrage was constructed in: 1968 1970 1971 1972
7 Chasma Barrage was built in: 1960 1965 1971 1975
8 The hills near Sargodha are called: Siwalik Hills Kirana Hills Purana Hills Murree Hills
9 The total length of Indus River is: 3000 km 2900 km 2700 km 2600 km
10 The estimated water storage capacity of Kalabagh Dam is: 7.9 Million acre ft 6.8 Million acre ft 4.5 Million acre ft 10 Million acre ft
11 Kalabagh Dam will be constructed on the river: Ravi Jehlum Indus Chenab
12 Pakistan constructed ___ Canals under the Indus Basin treaty.  8 10 12 15
13 Pakistan constructed ____ Barrages under the Indus Baisn treaty.  5 6 7 8
14 According to Indus Basin treaty, Pakistan built ______ Dams . 2 4 6 8
15 Indus have water of three rivers under the Indus Basin treaty: Indus, Jehlum and Bias Ravi, Sutluj and Bias Chenab, Indus and Bias  Sutluj, Indus and Bias
16 Indus water treaty was signed between Pakistan and India in: 1960 1961 1962 1963
17 The water storage capacity of Mangla Dam is: 5 Million acre feet 5.9 Million acre feet 6 Million acre feet 8 Million acre feet
18 Mangla Dam was completed in: 1967 1969 1971 1972
19 Tarbela Dam was completed in: 1973 1974 1976 1980
20 The power generation capacity of the Tarbela Dam is:  3478 MW 3400 MW 3510 MW 3610 MW