[{"id":210624,"question":"Based on the risks for the system being tested ______ be stopped.","choices":[{"text":"Planning","value":"A"},{"text":"when time has run out","value":"B"},{"text":"when all faults have been fixed correctly","value":"C"},{"text":"Testing","value":"D"},{"value":"E"}],"correctAnswer":4},{"id":210623,"question":"Based on the risk for your industry contract and special requirements ____ is done.","choices":[{"text":"Planning","value":"A"},{"text":"when time has run out","value":"B"},{"text":"Testing","value":"C"},{"text":"When all faults have been fixed correctly","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210622,"question":"At all test levels ______ testing is performed.","choices":[{"text":"Acceptance testing","value":"A"},{"text":"Functional","value":"B"},{"text":"Integrating testing","value":"C"},{"text":"Regression","value":"D"},{"value":"E"}],"correctAnswer":2},{"id":210621,"question":"Which of the following is the best source of Expected Outcomes for User Acceptance Test scripts.","choices":[{"text":"Actual results","value":"A"},{"text":"Program specification","value":"B"},{"text":"User requirements","value":"C"},{"text":"system specification","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210620,"question":"Which of these activates provides the biggest potential cost saving from the use of CAST.","choices":[{"text":"Test management","value":"A"},{"text":"Test design","value":"B"},{"text":"Test execution","value":"C"},{"text":"Test planning","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210619,"question":"Which of the following is true of the v-model.","choices":[{"text":"It states that modules are tested against user requirements","value":"A"},{"text":"It only models the testing phase","value":"B"},{"text":"It specifies the test techniques to be sued","value":"C"},{"text":"It includes the verification of designs","value":"D"},{"value":"E"}],"correctAnswer":4},{"id":210618,"question":"In prioritizing what to test the most important objective is to.","choices":[{"text":"Find as many faults as possible","value":"A"},{"text":"Test high risk areas","value":"B"},{"text":"Obtain good test coverage","value":"C"},{"text":"Test what ever is easiest to test","value":"D"},{"value":"E"}],"correctAnswer":2},{"id":210617,"question":"Which of the following a described in a unit test standard.","choices":[{"text":"Syntax testing","value":"A"},{"text":"Fulvalene partitioning","value":"B"},{"text":"Stress testing","value":"C"},{"text":"Modified condition or decisioncoverage","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210616,"question":"Which of the following is a form of functional testing.","choices":[{"text":"Boundary value analysis","value":"A"},{"text":"Usability testing","value":"B"},{"text":"Performance testing","value":"C"},{"text":"Security testing","value":"D"},{"value":"E"}],"correctAnswer":1},{"id":210615,"question":"Error guessing is best used.","choices":[{"text":"After more formal techniques have been applied","value":"A"},{"text":"As the first approach to deriving test cases","value":"B"},{"text":"By inexperienced testers","value":"C"},{"text":"After the system has gone live","value":"D"},{"value":"E"}],"correctAnswer":1},{"id":210614,"question":"Which of the following is included in the test plan document of the test documentation standard.","choices":[{"text":"What is not to be tested","value":"A"},{"text":"Test environment properties","value":"B"},{"text":"Quality plans","value":"C"},{"text":"Schedules and deadlines","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210613,"question":"Which of the following is part of system testing.","choices":[{"text":"Business process based testing","value":"A"},{"text":"Performance load and stress testing","value":"B"},{"text":"Usability testing","value":"C"},{"text":"Top down integration testing","value":"D"},{"value":"E"}],"correctAnswer":4},{"id":210612,"question":"Expected result are","choices":[{"text":"Only important in system testing","value":"A"},{"text":"Only used in component testing","value":"B"},{"text":"Most useful when specified in advance","value":"C"},{"text":"Derived from the code","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210611,"question":"The main focus of acceptance testing is.","choices":[{"text":"Finding faults in the system","value":"A"},{"text":"Ensuring that the system is acceptable to all users","value":"B"},{"text":"Testing the system with other systems.","value":"C"},{"text":"Testing from a business perspective","value":"D"},{"value":"E"}],"correctAnswer":4},{"id":210610,"question":"Which of the following techniques is NOT a black box technique.","choices":[{"text":"State transition testing.","value":"A"},{"text":"LCSAJ","value":"B"},{"text":"Syntax testing","value":"C"},{"text":"Boundary value analysis","value":"D"},{"value":"E"}],"correctAnswer":2},{"id":210609,"question":"Maintenance testing is.","choices":[{"text":"Updating tests when the soft ware has changed.","value":"A"},{"text":"Testing a released system the has been changed","value":"B"},{"text":"Testing by users to ensure that the system meets a business need.","value":"C"},{"text":"Testing to maintain business advantage","value":"D"},{"value":"E"}],"correctAnswer":2},{"id":210608,"question":"Which of the following is NOT part of configuration management.","choices":[{"text":"Auditing conformance to ISO 9000","value":"A"},{"text":"Status accounting of configuration items","value":"B"},{"text":"Identification of test versions","value":"C"},{"text":"Controlled library access","value":"D"},{"value":"E"}],"correctAnswer":1},{"id":210607,"question":"Regression testing should be performed.","choices":[{"text":"Every week","value":"A"},{"text":"After the software has changed","value":"B"},{"text":"As often as possible","value":"C"},{"text":"When the environment has changed","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210606,"question":"Statement coverage will to check for the following.","choices":[{"text":"Missing statements","value":"A"},{"text":"Unused branches","value":"B"},{"text":"Dead code","value":"C"},{"text":"Unused statement","value":"D"},{"value":"E"}],"correctAnswer":1},{"id":210605,"question":"A common test techniques during component test is.","choices":[{"text":"Statement and branch testing","value":"A"},{"text":"Usability testing.","value":"B"},{"text":"Security testing","value":"C"},{"text":"Performance testing","value":"D"},{"value":"E"}],"correctAnswer":1}]