More Classes
5th Class
6th Class
7th Class
8th Class
9th Class
10th Class
11th Class
12th Class
NAT I
NAT II
CSS
IQ
General Knowledge
MDCAT
ECAT
GAT General
GAT Subject
Other Links
Go to Home
Online Tests
PPSC Computer Science Chapter 23 Software Testing Online Test MCQs With Answers
Question # 1
__________ is a failure if a program doesn't work correctly.
Choose an answer
Programming
Testing
Documentation
Both a and b
Previous
Skip
Next
Question # 2
Poor software characteristics are.
Choose an answer
Only project risks
Only product risks
Project risks and product risks
Project risks or product risk
Previous
Skip
Next
Question # 3
Automated testing is.
Choose an answer
To automate the manual testing process
To assure quality of software
To increase costs
Noe of the above
Previous
Skip
Next
Question # 4
If an expected result is specified than
Choose an answer
We cannot run that test
It may be difficult to repeat the test
It may be difficult to determine if the test has passed or failed
We cannot automate the user inputs
Previous
Skip
Next
Question # 5
Review static analysis and dynamic testing have the same ____ as objective.
Choose an answer
Identifying defects
Fixing defects
1 and 2
None of the above
Previous
Skip
Next
Question # 6
Hybrid testing is
Choose an answer
Combination of one or more testing techniques
Combination of top town and bottom up testing
More testing techniques
Independent testing
Previous
Skip
Next
Question # 7
The overall objective of testing for software changes application wil function properly in the.
Choose an answer
Programming environment
Operating system environment
Operating environment
Life cycle environment
Previous
Skip
Next
Question # 8
Project quality management includes all activities of the performing organization that determines.
Choose an answer
Performance quilt control
Policies and responsibilities of a project
Performance plan management
Quality control management
Previous
Skip
Next
Question # 9
The functional testing is sometimes called.
Choose an answer
White box testing
Unit testing
Glass box testing
Black box testing
Previous
Skip
Next
Question # 10
A________ is lead by the author where an inspection is lead by a
Choose an answer
Inspector
Reader
Inspector reader
Author, trained moderator
Previous
Skip
Next
Question # 11
User requirement are the best source of expected outcomes for user _____ scripts.
Choose an answer
Actual results
Program specification
Acceptance test
System specification
Previous
Skip
Next
Question # 12
Cycloramic complexity method comes under which testing method.
Choose an answer
white box
Black box
Green box
Black/white box
Previous
Skip
Next
Question # 13
___ testing is costly time consuming and extensive component of testing.
Choose an answer
structural
Multiplatform
Unit
Stress
Previous
Skip
Next
Question # 14
The purpose of requirement phase is.
Choose an answer
To freeze requirements
Environment fault
Check exit criteria completion
Able to write shftware
Previous
Skip
Next
Question # 15
Which of the following would normally form part of a test plan
Choose an answer
frailer process
Incident reports
Risks
Data process
Previous
Skip
Next
Question # 16
_________ testing is done by user
Choose an answer
System testing
Acceptance testing
Black box testing
White box testing
Previous
Skip
Next
Question # 17
An important benefit of ___ is that they enable the code to be tested before the execution environment is ready.
Choose an answer
Code inspections
Authors
Inexperienced staff
Moderators
Previous
Skip
Next
Question # 18
Code coverage is used as a 208 measure of what.
Choose an answer
Defects
Trends analysis
Test effectiveness
Time spent testing
Previous
Skip
Next
Question # 19
White box testing is.
Choose an answer
Same as glass box testing
Same as clear box testing
Both a and b
Boundary testing
Previous
Skip
Next
Question # 20
Which of the following is not a quality characteristic listed in ISO 9126 standard.
Choose an answer
Functionality
Usability
Supportability
Maintainability
Previous
Skip
Next
Question # 21
Maintenance testing is.
Choose an answer
Updating tests when the soft ware has changed.
Testing a released system the has been changed
Testing by users to ensure that the system meets a business need.
Testing to maintain business advantage
Previous
Skip
Next
Back