[{"id":210524,"question":"Which of these terms apply to identifying quality standards and how to satisfy them.","choices":[{"text":"Quality projections","value":"A"},{"text":"Quality management","value":"B"},{"text":"Quality planning","value":"C"},{"text":"Quality overview","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210523,"question":"Over working team members and poor product quality are negative possibilities if","choices":[{"text":"Quality requirements are not met","value":"A"},{"text":"Due to customer complaints and late product.","value":"B"},{"text":"Poor quality","value":"C"},{"text":"Termination","value":"D"},{"value":"E"}],"correctAnswer":1},{"id":210522,"question":"Which of the processes includes all activates of the performing organization that determines policies and responsibilities of a project.","choices":[{"text":"Performance quality control","value":"A"},{"text":"Project quality management","value":"B"},{"text":"Performance plan management","value":"C"},{"text":"Quality control management.","value":"D"},{"value":"E"}],"correctAnswer":2},{"id":210521,"question":"Which team defines the process of project compliance with policies and procedures.","choices":[{"text":"Quality control","value":"A"},{"text":"Quality assurances","value":"B"},{"text":"Quality audits","value":"C"},{"text":"Quality control management","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210520,"question":"Small team established to use the tool when a new _____ tool is purchased","choices":[{"text":"Testing","value":"A"},{"text":"Design","value":"B"},{"text":"Coding","value":"C"},{"text":"Actual testing","value":"D"},{"value":"E"}],"correctAnswer":1},{"id":210519,"question":"___________ occurs during the construction stage of development.","choices":[{"text":"Plan","value":"A"},{"text":"Design","value":"B"},{"text":"Coding","value":"C"},{"text":"Actual testing","value":"D"},{"value":"E"}],"correctAnswer":4},{"id":210518,"question":"Equivalence partitioning is.","choices":[{"text":"A black box testing technique used only by developers","value":"A"},{"text":"A black box testing technique than can only be used during system testing.","value":"B"},{"text":"A black box testing technique appropriate to all levels of testing","value":"C"},{"text":"A white box testing technique appropriate for component testing.","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210517,"question":"Cycloramic complexity method comes under which testing method.","choices":[{"text":"white box","value":"A"},{"text":"Black box","value":"B"},{"text":"Green box","value":"C"},{"text":"Black/white box","value":"D"},{"value":"E"}],"correctAnswer":1},{"id":210516,"question":"The concept of fit is importantin___","choices":[{"text":"Design only","value":"A"},{"text":"Both design and testing","value":"B"},{"text":"Testing only","value":"C"},{"text":"Requirement analysis only","value":"D"},{"value":"E"}],"correctAnswer":2},{"id":210515,"question":"___ is the technique used to determine that the solution solves the problem.","choices":[{"text":"Data","value":"A"},{"text":"Validity","value":"B"},{"text":"Testing","value":"C"},{"text":"Problem","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210514,"question":"successful _________ necessitates a portfolio of web based testing tools.","choices":[{"text":"Web based testing","value":"A"},{"text":"Integrate","value":"B"},{"text":"Factor","value":"C"},{"text":"Unit testing","value":"D"},{"value":"E"}],"correctAnswer":1},{"id":210513,"question":"The process starting with the________ modules is called bottom up integration.","choices":[{"text":"Starting","value":"A"},{"text":"Terminal","value":"B"},{"text":"Integrated","value":"C"},{"text":"None of the above","value":"D"},{"value":"E"}],"correctAnswer":2},{"id":210512,"question":"__ process does not include deliverable base lining.","choices":[{"text":"Defect prevention","value":"A"},{"text":"defect management","value":"B"},{"text":"Management reporting","value":"C"},{"text":"Prevention reporting","value":"D"},{"value":"E"}],"correctAnswer":2},{"id":210511,"question":"_________ system will unlikely to cause a failure.","choices":[{"text":"Liked by user","value":"A"},{"text":"Fault free","value":"B"},{"text":"Reliable","value":"C"},{"text":"Management satisfaction","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210510,"question":"The inputs for developing a ________ are taken from project plan.","choices":[{"text":"Test plan","value":"A"},{"text":"Business plan","value":"B"},{"text":"Support plan","value":"C"},{"text":"Final test report","value":"D"},{"value":"E"}],"correctAnswer":1},{"id":210509,"question":"The process starting with the terminal modules is called.","choices":[{"text":"Top down integration","value":"A"},{"text":"Bottom up integration","value":"B"},{"text":"Module integration","value":"C"},{"text":"None of the abvoe","value":"D"},{"value":"E"}],"correctAnswer":2},{"id":210508,"question":"The purpose of requirement phase is.","choices":[{"text":"To freeze requirements","value":"A"},{"text":"Environment fault","value":"B"},{"text":"Check exit criteria completion","value":"C"},{"text":"Able to write shftware","value":"D"},{"value":"E"}],"correctAnswer":1},{"id":210507,"question":"Which in general is the least required skill of a good tester.","choices":[{"text":"Being diplomatic","value":"A"},{"text":"Able to write software","value":"B"},{"text":"Having good attention to detail","value":"C"},{"text":"Able to be relied on","value":"D"},{"value":"E"}],"correctAnswer":2},{"id":210506,"question":"During which test activity could faults be found most cost effectively.","choices":[{"text":"Execution","value":"A"},{"text":"Design","value":"B"},{"text":"Planning","value":"C"},{"text":"Check exit criteria completion","value":"D"},{"value":"E"}],"correctAnswer":3},{"id":210505,"question":"A______ is a condition that can result in a loss.","choices":[{"text":"Test","value":"A"},{"text":"Risk","value":"B"},{"text":"Method","value":"C"},{"text":"Gain","value":"D"},{"value":"E"}],"correctAnswer":2}]