Name the port whose operational controlled were transferred in the hands of chinese overseas port holding ltd.by pakistan in the last week of january 2013.
After completed, Metro bus system consists of _______ long road truck for the Metro Bus Service, from Gaju mata to Shahadra, out of this track 8.5 km is elevated.