PPSC Computer Science Chapter 23 Software Testing Online Test MCQs With Answers
Question # 1
Quality audits define the process of project compliance with.
Choose an answer
Quality control
Quality assurances
Polices and procedures
Quality control management
Previous
Skip
Next
Question # 2
The overall objective of testing for software changes application wil function properly in the.
Choose an answer
Programming environment
Operating system environment
Operating environment
Life cycle environment
Previous
Skip
Next
Question # 3
The functional testing is sometimes called.
Choose an answer
White box testing
Unit testing
Glass box testing
Black box testing
Previous
Skip
Next
Question # 4
_______ includes the verification of designs.
Choose an answer
Off the shelf sotware
Validation
Verification
V-model
Previous
Skip
Next
Question # 5
_________ testing is done by user
Choose an answer
System testing
Acceptance testing
Black box testing
White box testing
Previous
Skip
Next
Question # 6
User requirement are the best source of expected outcomes for user _____ scripts.
Choose an answer
Actual results
Program specification
Acceptance test
System specification
Previous
Skip
Next
Question # 7
A________ is lead by the author where an inspection is lead by a
Choose an answer
Inspector
Reader
Inspector reader
Author, trained moderator
Previous
Skip
Next
Question # 8
During the software development process at what point can the test process start.
Choose an answer
When the code is complete
When the design is complete
When the software requirements have been approved
When the fist code module is ready for unit testing.
Previous
Skip
Next
Question # 9
Which of the processes includes all activates of the performing organization that determines policies and responsibilities of a project.
Choose an answer
Performance quality control
Project quality management
Performance plan management
Quality control management.
Previous
Skip
Next
Question # 10
___________ is the type of project status report.
Choose an answer
Test factor
Function matrix
Test phase
Documents
Previous
Skip
Next
Question # 11
A potential problem with the point system described thus far has to do with and effort known as a.
Choose an answer
Rolling baseline
Package
Technique
Computing
Previous
Skip
Next
Question # 12
Testing system with live data is done using.
Choose an answer
Static test tools.
Dynamic test tools
Loop testing
Iteration testing
Previous
Skip
Next
Question # 13
Design fault is a reason for
Choose an answer
Testing fault
Software fault
Failure
Documentation fault
Previous
Skip
Next
Question # 14
Statement testing is a _ technique.
Choose an answer
Black box
White box
Unit testing
system testing
Previous
Skip
Next
Question # 15
The risks associates with testing will be called.
Choose an answer
test result
Test process
Test factors
Test data
Previous
Skip
Next
Question # 16
The process starting with the terminal modules is called.
Choose an answer
Top down integration
Bottom up integration
Module integration
None of the abvoe
Previous
Skip
Next
Question # 17
A_ is a central repository of data made available to users
Choose an answer
Data base
Data warehouse
Data mine
Data process
Previous
Skip
Next
Question # 18
The best documentation is a part of the systems.
Choose an answer
computer
Analysis
Retest
documentation
Previous
Skip
Next
Question # 19
Which of these is a debugging tool.
Choose an answer
Windows
Heap trace
SCM
Editor
Previous
Skip
Next
Question # 20
The structure testing is sometimes called.
Choose an answer
Glass box testing
Black box testing
Unit testing
While box testing
Previous
Skip
Next
Question # 21
OTSS stands
Choose an answer
Off -Test sheik sotware
Off -True shelf software
Off -The shelf software
Off-The self sotware
Previous
Skip
Next